Grouting
| If you have completed all the tiling and allowed the adhesive to dry out for 24 hours (or 72 hours minimum when tiling onto tile) you are then ready to start grouting. Check that the joints are dry and free of adhesive residue or dust.
Working in small areas, use a grout float to fill the joint with cementitious or ready-mixed grout. Clean off the grout using the grout float, strike off excess grout at 450 using a clean fine sponge. Polish tiles with a soft, dry cloth. NB: Epoxy grouts (recommended for use on worktops) require a different type of application, refer to the packaging instructions. Showers should not be brought into service for 14 days after grouting. |
![]() |
|
![]() |
||