Surface preparation
| Substrate | Prior to tiling |
| Gypsum plaster | Leave new plaster for 4 weeks. Brush shiny plaster with stiff bristled brush and remove any dust. Prime with BAL Prime APD, diluted 1:1 with water. Ensure old finish coat plaster is sound prior to fixing tiles. |
| New dense concrete, concrete blocks & bricks | Leave for 6 weeks. Check for suitability prior to application. |
| Cement: sand rendering | Leave for 2 weeks. Make sure any laitence, dirt and loose material is thoroughly brushed off. |
| Existing tiles | Check they are well bonded and free from grease/oily deposits. Score existing tiles to aid adhesion. |
| Plasterboard, fibre or cement boards | Boards should be securely screwed to a timber framework at 300mm centres, horizontally and vertically, to provide a rigid substrate. |
| Paintwork or wallpaper | Loose paint, emulsion paint, loose plaster and all wallpaper must be removed before commencing tiling. Score any gloss paint. Remove any flaky paint mechanically (do not use paintstripper). |